Examples and samples estimate. Determination of the value of design and survey work

THE GOVERNMENT OF MOSCOW

Committee of the City of Moscow on Provision Policy in Construction
and state examination of projects

Methodik
calculating the cost of scientific,
Regulatory methodical, project
and other types of work (services),
implemented with the attraction of funds
Budget of the city of Moscow
(based on normal labor)

MRR-3.2.67.02-13

"Methods for calculating the cost of scientific, regulatory, methodological, design and other types of work (services) carried out with the involvement of the budget of the city of Moscow (based on the normalized labor costs). MRR-3.2.67.02-13 "Developed by specialists of the GBU" NIC "(S.A. Kopbaev, E.A. Igoshin, A.V. Minaeva) on the basis of the state assignment of the Committee of the city of Moscow on the pricing policy in the construction and state examination of projects.

"Methods for calculating the cost of scientific, regulatory, methodological, design and other types of work (services) carried out with the involvement of the budget of the city of Moscow (based on the normalized labor costs). MRR-3.2.67.02-13 "approved and put into effect by order of the Committee of the city of Moscow on the pricing policy in the construction and state examination of projects from 04.07.2014 No. 60.

"Methodology" is enacted instead of Annex 2 to MRR-3.2.06.07-10.

Introduction

This "methodology for calculating the value of scientific, regulatory, methodological, design and other types of work (services) carried out with the involvement of the budget of the city of Moscow (based on the normalized labor costs). MRR-3.2.67.02-13 "(In the future, the" Methodology ") is intended to determine the initial (maximum) price of work (services), as well as to determine the cost of contracting and subcontract (services), for which there are no regulatory and methodological instruments for pricing .

These works include individual species. design work and the works of urban planning and territorial planning, research work, the development of regulatory and methodological documentation, etc.

A distinctive feature of these works is the lack of functional dependence of the complexity of their implementation with natural indicators applied when calculating the value of most types of design work (M, M 2, M 3, pcs. Etc.).

When developing "Methods", the following regulatory and methodological documents were used:

- "A collection of basic prices for project work for construction, carried out with the involvement of the budget of the city of Moscow. MRR-3.2.06.07-10. "

1. GENERAL PROVISIONS

1.1. This "Methodology" is an integral part of the norms and regulations in the design and construction complex of Moscow.

1.2. The main types of work (services) for which basic prices are calculated on the basis of labor-free labor in accordance with this "methodology" include:

Project works that are lacking regulatory and methodological documents on pricing in design, or the value of which in accordance with the "Collection of basic prices for project work for construction, carried out with the involvement of the budget of the city of Moscow" is recommended to determine on the normalized labor costs;

Development of urban planning documentation and territorial planning documents, to determine the cost of the development of which there are no regulatory and methodological documents;

Development of research and regulatory documentation;

Carrying out marketing research.

1.3. To calculate the basic price, normalized labor costs are adopted for five-day with two weekend 40-hour working weeks (Articles 91, 100 of the Labor Code of the Russian Federation).

1.4. The basic prices calculated on the basis of "Methods" take into account the following costs:

To pay for all participants of the work performed;

Deductions for state social and medical insurance;

Depreciation deductions on the complete restoration of the main production facilities and costs for all types of their repair;

Rent;

Taxes and fees established in the legislative procedure (except VAT);

Profit.

1.5. The basic prices do not include and be compensable to the customer the following accompanying costs:

The cost of acquiring typical documentation for buildings and industrial products provided for designing objects;

Travel and transportation costs associated with the design of the object outside the location of the project organization;

Expenses for international and long-distance telephone conversations, international and intercity postal and telegraph shipments related to design;

Expenses for paying for accounts of having consistent and conducting expertise organizations on the work performed in the prescribed manner or on behalf of the Customer in the event that these services are not included in the list of documents issued to applicants without charging;

Scientific and technical support of objects;

Expenses for payment of services for translation organizations from foreign and on foreign language project and reference and methodical documentation;

Costs of making additional copies of project documentation over the required four copies;

Costs of paying for organizations providing data on traffic flows, climatic conditions and background concentrations of pollutants;

Value added tax.

1.6. The basic works of work are calculated on the basis of this "technique" as of 01/01/2000.

1.7. Baby prices to the current level is carried out using the coefficient of recalculation of the basic value of design work ( TO Per) in the current price level approved in the prescribed manner.

1.8. When determining the cost of work on the basis of the basic prices calculated on this "methodology", the coefficients that take into account the complicating (simplifying) factors of the work are not applied.

1.9. Reducing the timing of work on regulatory (if such a requirement is issued in the prescribed manner) is taken into account by the use of corrective coefficients, the meanings of which are given in the "Collection of basic prices for project work for the construction of facilities carried out with the involvement of the budget of the city of Moscow. MRR-3.2.06.08-13, Table 4.2.1.

2. Methods for calculating the cost of work

2.1. The cost of completion of work is calculated on the basis of basic prices. Basic prices are calculated based on the normalized labor costs, by the formula:

Average salary as of 01/01/2000; (9590 rubles are accepted. / month.);

R - level of profitability (accepted R = 10 %);

TO Z. - coefficient taking into account the share of salary at cost ( TO Z. Accepted 0.4).

2.3. The coefficient that takes into account the level of qualifications (participation) of performers in the development ( TO kV (uch)), is calculated by the formula:

AND I. - the average monthly salary index of immediate performers;

C. I. - the number of performers for groups with the same level of salary;

T. F I. - The actual work hours of performers with the same level of salary.

Taking into account basic values Zp , R and TO Z. and using the formula, calculates the average monthly single (one working) production for the work carried out:

2.4. The regulatory duration of the performance is determined by the formula:

where FROM B. - The cost of development at prices on 01/01/2000.

Table 2.1.

Development cost

FROM B (2000), thousand roubles.

T. NP. (month), with the number of working C. P (person)

3 people

5 people

10 people

15 people

20 people

25 people

100,0

200,0

300,0

400,0

500,0

600,0

700,0

800,0

10,1

900,0

11,4

1000,0

12,6

Notes:

1. The values \u200b\u200bgiven in the table are not mandatory for calculations, but are intended to preliminarily assess the number of participants in the performance of work.

2. With intermediate and missing values \u200b\u200bof the number of employees ( C. P), The values \u200b\u200bof the duration of the performance are determined by interpolation and extrapolation methods.

2.5. The cost of execution of work at current prices is calculated based on the basic prices by the formula:

FROM TC. - cost of work at current prices;

C. B (2000) - the basic price of work in the price level on 01.01.2000;

TO per - The coefficient of recalculation of the basic value of design work in the current price level. Value TO per It is approved in the prescribed manner.

Table 2.2.

Indices of the average monthly salary of direct performers (developers)

Name posts

The average monthly salary index of direct performers

Head of the Workshop, Department, Department, Laboratory

2,00

Deputy Head of the Workshop, Department, Department, Laboratory

1,90

Chief Architect of the Project (HAP), chief Engineer Project (GUY), Head of the Sector, Leading Researcher

1,85

Chief Specialist, Senior Researcher

1,80

Head of the Group, Head of the Group

1,75

Researcher

1,50

Leading Specialist, Junior Researcher

1,00

Architect (engineer, economist, specialist) I category

0,90

Architect (engineer, economist, specialist) category II

0,80

Architect (engineer, economist, specialist) III category

Planned work hours, days

T. P

The number of performers of one qualification, people.

C. I.

Index of the level of salaries of specialists of work performers

Specialist qualification coefficient (participation)

TO kV (uch)

Σ (gr. 3: gr. 4 ∙ gr. 5 ∙∙ gr. 6) / Σ gr. five

Head of workshop

0,150

The chief architect of the project

1,85

0,231

Chief Specialist

1,620

Leading Specialist

1,100

Architect I-oh category

0,900

Technician

0,65

0,439

TOTAL

THE GOVERNMENT OF MOSCOW

Committee of the City of Moscow on Provision Policy in Construction

and state examination of projects

Additional and related work

Collection 9.1.

Method for calculating cost

Scientific, regulatory methodical,

Design and other types of work (services)

Based on normal labor

MRR-9.1-16

Collection 9.1 "Methods for calculating the cost of scientific, regulatory, methodological, design and other types of work (services) on the basis of normal labor. MRR-9.1-16 "(hereinafter referred to as the collection) was developed by the specialists of GAU" NICA "(S.V. Lahaev, E.A. Igoshin, A.V. Minaeva).

The collection was approved and enacted from January 9, 2017 by the order of the Committee of the City of Moscow on the pricing policy in the construction and state examination of projects of December 29, 2016 No. ICE-OD / 16-75.

The collection is an integral part of the unified regulatory framework of the MRR.

The collection was developed in return MRR-3.2.67.02-13.

Introduction

1. General Provisions

2. Methods for calculating the cost of work

application

Examples of calculations

Introduction

This Collection 9.1 "Methods for calculating the cost of scientific, regulatory, design and other types of work (services) on the basis of normal labor costs. MRR-9.1-16 "(In the future, the methodology) is developed in accordance with the state task.

This technique is intended for use by state customers, project and other interested organizations when calculating the initial (maximum) contract prices and the determination of the value of scientific, regulatory and methodological, design and other types of work (services), carried out with the attraction of the budget of the city of Moscow and for which there are no Regulatory procedures for pricing.

When developing the methodology, the following regulatory and methodological documents were used:

Civil Code of the Russian Federation;

Collection 1.1 "General guidelines for the use of Moscow regional recommendations. MRR-1.1-16. "

1. GENERAL PROVISIONS

1.1. This technique is an integral part of the unified regulatory framework of the MRR.

1.2. In determining the cost of work on the basis of this method, it should also be guided by the provisions of the collection 1. 1 "General instructions on the application of Moscow regional recommendations. MRR-1.1-16. "

1.3. Bringing the basic value of the work defined in accordance with this methodology is carried out to the current price level by applying the recalculation coefficient (inflationary change) approved in the prescribed manner.

1.4. The main types of work (services), the cost of which is calculated on the basis of the normalized labor costs in accordance with this technique include:

Design works and works of urban design, for which there are no regulatory and methodological documents on pricing in design, or the cost of which in accordance with the "general instructions on the application of Moscow regional recommendations. MRR-1.1-16 "and other MRR collections are recommended to determine the normalized labor costs;

Development of urban planning documentation and territorial planning documents, to determine the cost of the development of which there are no regulatory and methodological documents;

Development of research and regulatory documentation;

Carrying out marketing research.

1.5. To calculate the basic price, normalized labor costs are adopted for five-day with two weekend 40-hour working weeks (Articles 91, 100 of the Labor Code of the Russian Federation).

1.6. The basic prices calculated on the basis of the methodology, take into account the costs listed in paragraph 3.3 MRR-1.1-16.

1.7. Basic prices calculated on the basis of the methodology are not taken into account the concomitant expenses listed in paragraph 3.6 MRR-1.1-16.

1.8. When determining the cost of work on the basis of base prices calculated on this technique, the coefficients that take into account the complicating (simplifying) factors of work are not applied.

1.9. Reducing the timing of work on the regulatory (if such a requirement is issued in the prescribed manner) is taken into account by the use of corrective coefficients, the values \u200b\u200bof which are shown in Table 4.1 MRR-1.1-16.

2. Methods for calculating the cost of work

2.1. The cost of completion of work is calculated on the basis of basic prices. Basic prices are calculated based on the normalized labor costs, by the formula:

C B. - Basic work price;

On Wednesday - average generation;

T P. - planned duration of work;

H p. - the number of performers;

KV (uch) - The coefficient that takes into account the level of qualifications (participation) of performers in development.

2.2. Average monthly outcome On Wednesday Calculated by the formula:

Zp cf. - average salary ( Zp cf. 9590 rubles / month);

R - level of profitability (accepted R = 10%);

To Z. - coefficient taking into account the share of salary at cost ( To Z. Accepted 0.4).

2.3. The coefficient that takes into account the level of qualifications (participation) of performers in the development ( KV (uch)), is calculated by the formula:

And I. - the average monthly salary index of immediate performers;

C. I. - the number of performers for groups with the same level of salary;

T F. I. - The actual work hours of performers with the same level of salary.

Taking into account basic values Zp, R and To Z. and using formula 2.2, calculated the average monthly single (one working) production for the work carried out:

2.4. The regulatory duration of the performance is determined by the formula:

where With B. - Development cost.

Table 2.1.

Development cost With B., thousand roubles.

T NP. (month), with the number of working H p. (person)

Notes:

1. The values \u200b\u200bgiven in the table are not mandatory for calculations, but are intended to preliminarily assess the number of participants in the performance of work.

2. With intermediate and missing values \u200b\u200bof the number of employees ( H p.), The values \u200b\u200bof the duration of the performance are determined by interpolation and extrapolation methods.

Table 2.2.

Indices of the average monthly salary of direct performers (developers)

Name posts

The average monthly salary index of direct performers

Head of the Workshop, Department, Department, Laboratory

Deputy Head of the Workshop, Department, Department, Laboratory

Chief Architect of the Project (HAP), Chief Engineer of the Project (GUI), Head of the Sector, Leading Researcher

Lite specialist, senior researcher

Head of the Group, Head of the Group

Researcher

Leading Specialist, Junior Researcher

Architect (engineer, economist, specialist) I category

Architect (engineer, economist, specialist) category II

Architect (engineer, economist, specialist) III category

Architect (engineer, economist, specialist)

ATTACHMENT

Table 1

An example of calculating the qualification coefficient (participation) of the performers involved in the performance of work (services)

Name of posts performers

The actual time of the participation of the artist in the work, days

Planned work hours, days

The number of performers of one qualification, people.

C. I.

Index of the level of salaries of specialist performers

Specialist qualification coefficient (participation)

KV (uch)

Σ (GR3: GR4 x GR5 x GR6) / ΣGR5

Head of workshop

The chief architect of the project

Chief Specialist

Leading Specialist

KV (Uch) \u003d 4,440 / 8 \u003d 0.555

table 2

An example of calculating the basic price of work (services)

Average monthly regulatory salary of performers, rub.

Zp cf.

Number of business days per month, days

Middle day salary performers, rub. (GR.2 / gr.3)

The proportion of salary in the cost of work,

Profitability,

Multi-day single production, rub.

(gr.4h (1 + gr.6)) / gr.5

Duration of development, days

The number of performers, people

Qualification coefficient (participation)

KV (uch)

Basic price, rub.

(gr. 7 x gr. 8 x gr. 9 x gr.10)

The cost of the work performed (services) at current prices is determined by the formula (4.1) "General Instructions on the Application of Moscow Regional Recommendations. MRR-1.1-16 "and amounts to:

With shopping center \u003d c b x per \u003d 212942 x 3,533 \u003d 752324.1 rubles,

where k per \u003d 3,533 is the coefficient of recalculation (inflationary change) to the basic value of the works of urban planning design and design work IV quarter of 2016 to the prices of 2000 (according to the order of Moskomexpertiza dated 21.01.2016 No. ICE-OD / 16-1).

Practicing in the field of assessing the value of design and survey work about 7 years, I made a huge number of conclusions relating to the complexity and imperfection of the pricing system in this field of activity, add, intellectual and expensive area commercial activity Design and Exquising Bureau.

I will start with the fact that the assessment of the cost of design and survey work (hereinafter referred to as the text) is produced at the moment when there is no project, and maybe there is even a sketch of the future building, structures, linear facility, etc. Most recently collided with the "album" (sketch of the future sports complex), in which the area, the volume, the presence of the built-in facility premises, the presence of a nearby infrastructure, and 3 pictures of the desired Fock - was required to determine the cost of design.

Experience suggested - you need at least to understand the composition of the projected volumes. To date, the document determining the composition and content of the project documentation , is an . But this resolution contains only the composition of the volume of the project, as well as the composition for the content of engineering research, which in percentage of the cost of 20-25% of the value of the main design work, also does not understand the composition and content of the design of external engineering networks: water supply, water disposal , power supply, gas supply, etc. ...

I will not thicken the paint, the answer and these questions are (if you ask them), worse, if we simply miss these volumes.

So, in order to determine the composition and content of engineering surveys, it suffices to apply to a methodological manual for determining the cost of engineering surveys for the construction of Gosstroy Russia: FSUE PNIIIS Gosstroy Russia, 2004, in which the composition of the necessary surveys - geology, geodesy, Ecology, as well as a list of documents that determine the composition of these surveys, which samples and in what quantity should be produced on the studied area.

It remains to deal with the design of external engineering networks - the answer is the technical task (hereinafter referred to as the TK), in which the customer (sometimes the designer himself) formulated the requirements and a list of gas, water, electricity gas, and so on for the commissioning of gas, water, power supply networks, and Also necessary technical conditions for connecting to these networks (define distances to the nearest seats of input or generating structures).

1st stage - source data, completed!

The 2nd stage, admit, no less difficult - determining the cost of the PIR!

There are 3 possible methods for calculating the cost of design work and 2 possible methods for calculating the cost of engineering surveys.

Methods for estimating the cost of design work.

Calculation of natural indicators of the object (NGOs)

The 1st method of calculation is based on natural indicators of the object (hereinafter NGOs) - the area, volume, length of linear objects, performance for generating objects, etc., which in the basic price indicators in the basic prices. To date, this is the most convenient and reliable method for determining the price of design work. Developed about 250 collectors of basic prices for most types of work. The LC applies to the federal budget and municipal budgets of the constituent entities of the Russian Federation. For the Moscow Region and the Moscow City Budget, Moscow Regional Recommendations are developed for Moscow Regional Recommendations, abbreviated MRR, which are necessarily applied in the calculation of the estimation of the day when financing from the Mosgorbuduch. In more detail about this method of calculation, you can learn from the methodological instructions for the definition of the PIR approved.

Calculation PIR based on the cost of construction (OSS)

The 2nd and less convenient method of calculation is the calculation of the cost of the feast percentage of the cost of SMR, which is not always convenient due to the lack of estimates before design, and it is also not always possible to find an analog object. There are a number of reference books of objects of analogs and methods for the integrined determination of the cost of construction, for example: construction price standards (NCS) are included in the federal register of estimated standards; The regional reference book of the RCC-2014 construction, the feasibility study - developed by Mosstroyzena, and the like.

Having determined any and possible methods of construction, the percentage of the cost of the CMR , Reported in reference books and collections of basic prices, we determine the cost of the PI. Again, in more detail in the MU 2010 approved by the Order of the Ministry of Regional Development of December 29, 2009 No. 620.

Calculation of the cost of labor feast

The 3rd method is a favorite contractor and unloved by the customer - labor costs (hereinafter referred to as 3P, why 3P - a form for calculating the estimate of labor costs, approved under the number 3P). With this method, the actual time of the participation of designers is determined in the development of any volume of the project or a constructive element of the building of the structure and other types of works that are absent in reference books and basic price collections. The method is convenient for the designer in connection with the definition of the actual participation of specialists in the development of the project by the expert, the Contractor himself decides who and how much time participates in the design. From this flows the design cost. More information about this method in the clarifications of the "Centralvestproject" for 1999.

Determination of the cost of engineering surveys.

The main method of determining the price of engineering surveys is to calculate on the basis of natural indicators reported in reference books and collections of basic prices for 1991 and 2001. To date, for surveys there are only federal reference books of basic prices, which are used for any source of funding, but for Moscow money it is impossible to forget about the city order standard reported in.

The 2nd possible method of determining the value of the surveys are labor costs. Here, all similar to labor costs in the design, we define the actual time of the participation of specialists, therefore, we receive the price.

Automation of estimated calculations PIR. PIR program

To date, all the above methods for calculating design and survey work, as well as the mentioned ICC and MRR are maintained and automated in, note of federal LBC reference books are included in the system on the basis of a direct contract with the CentralvestProtect. The program allows you to use search engines to select the desired rates, read the necessary methodological documents, as well as unload the documentation to any convenient XLS format, PDF, WORD ... The program allows you to simplify the task of at least 3rd in relation to the usual calculation in Exel, and will also remove With you problems on tracking the relevance of collections, because On against reference books, there are marks - included, in the register of estimated standards a collection or canceled, and moreover - what a directory came out instead of canceled.

How to quickly learn to consider the feast

For those who were interesting and it is useful to carry it out. We recommend that you have learned on ours! In just a few classes, you will learn the methods of calculating design and survey work, learn about the composition and content of the design and survey documentation, learn how to work in federal (ICC) and Moscow (MRR) reference books, ask questions about the types of work that interests you in the preparation of the feast, Explore the leading program for calculating the estimation of the PI system, and also receive a certificate of short-term advanced training of the sample established by the state.